My Sinchew/ BandarMalaysia

Cold War 2 à la Malaysia

In an increasingly intense political power play where the truth is pulling away from us, the rakyat are but a disposable chess piece, the deals behind all the more prepared to betray us.


KL-Singapore HSR to be fully operational by 2026

The Kuala Lumpur-Singapore High-Speed Rail (HSR) project is expected to be fully operational by 2026.


Public funds not used to settle 1MDB woes

Najib stresses that public funds are not being used to resolve 1MDB's financial woes.


No link between Bandar Malaysia sale and HSR project: 1MDB

The sale of Bandar Malaysia project equityto Iskandar Waterfront Holdings (IWH)-China Railway Engineering Corporation Sdn Bhd (CREC) consortium has no connection with the eventual award of the Kuala Lumpur-Singapore High Speed Rail (HSR) project, 1Malaysia Development Bhd (1MDB) said.


1MDB RE warns of fake offer letters to develop Bandar Malaysia, TRX

Khidmat Runding Jatipadu's letters for offer of appointment as joint developer or consultant for the Tun Razak Exchange (TRX) project are fake, says 1MDB Real Estate Sdn Bhd (1MDB RE).


1MDB RE receives planning approval for Bandar Malaysia project

1MDB Real Estate Sdn Bhd (1MDB RE), has received planning approval from the Kuala Lumpur City Hall for its Bandar Malaysia mixed-used urban development in Sungai Besi.


1MDB issues to be resolved with rationalization plan: Najib

1Malaysia Development Bhd (1MDB) can repay debts and resolve cash flow issues if the rationalisation plan being currently undertaken is unimpeded.


 

Copyright © 2017 MCIL Multimedia Sdn Bhd (515740-D).
All rights reserved. Contact us : [email protected]